ON-GOING PROJECTS
1. Balya Pb-Zn Underground Mine Operation – North Region
Horizontal Gallery and Half Vertical Ramp Shaft Construction Works / BALIKESİR
Excavation Dia. : 14,00 m2 – 56,00 m2 / %14 Ramp Slope
Employer : Esan-Eczacıbaşı Hammadde Sanayi ve Ticaret A.Ş.
2. Construction of Iskenderun Hospital Access Roads
Motorway Tunnel Construction / İSKENDERUN
Gallery Excavation : 550,00 m x 2 tube / Excavation Area : 170,00 m2 & 113,00 m2
Employer : SNH İnşaat A.Ş.
3. New Liberty Altın Madeni İşletmesi
Shaft Construction (Raise Boring) and Shotcrete Lining Works (120,00 m + 223 m Depth / D : 4,00 m) / LIBERIA
Depth : 343,00 m (120,00 + 223,00) / Excavation Dia. : 4,00 m
Employer : BEA Mountain Mining Incorporated
COMPLETED PROJECTS
1. Balya Pb-Zn Mine Operation
Shaft Construction (Shaft Sinking) / BALIKESİR
Depth : 240,00 m (120 x 2) / Excavation Dia. : 5,00 m
Employer : Esan-Eczacıbaşı Hammadde Sanayi ve Ticaret A.Ş.
2. Küre Copper Mine
Horizontal Gallery and Half Vertical Ramp Shaft Construction Works / KASTAMONU
Employer : Etibakır İşletmeleri A.Ş. (Cengiz İnşaat Sanayi ve Ticaret A.Ş.)
3. Madenköy Copper Mine Operation
Copper Mine Stripping Operations / SİİRT
Employer : Etibakır İşletmeleri A.Ş. (Cengiz İnşaat Sanayi ve Ticaret A.Ş.)
4. Yatağan Thermal Power Plant
Conduit Construction Works / MUĞLA
Excavation Length : 2 x 50,00 m
Employer : Entek Elektrik İnşaat A.Ş.
5. Güneşli Hydroelectric Power Plant Construction
Tunnel Completion Works – Excavation, Supporting, Lining and Concrete Works / TRABZON
Employer : Asya Enerji Elektrik Üretim Sanayi Ticaret A.Ş.
6. Aydın Güzelhisar Neighborhood Parking Lot Construction
Construction of a 584-Vehicle Capacity Parking Lot and Cafe / AYDIN
Employer : Aydın Belediyesi